COA Checklist
In order for the Historic Preservation Commission to accurately review a proposed project in a timely manner, applications must be complete and thorough. In order to assist applicants in submitting a complete and thorough application, this checklist sets out the MINIMUM supplemental materials which must be submitted for various project elements. Unless otherwise noted or determined by the HPC or Village of Lancaster staff, the following information and drawings MUST be included in the submittal package for your application.
​
For an application to be accepted, each and every item is required at the time of application submittal; failure to submit these items may result in a project review being prolonged or delayed.
All Projects
-
Completed Application Form
-
$25 cash or check made payable to "Village of Lancaster"
-
Color photographs of existing conditions (digital preferred)
-
Photos from any/all public right-of-ways (streets, sidewalks, trails, etc.)​
-
Specific photos of elements to be modified
-
-
Historic photographs/images (if any)
Signage/Awnings
-
​To-scale color drawings of the proposed sign(s)/awning(s)
-
To-scale drawings/photograph showing proposed location of the sign(s)/awning(s) on the structure/site
-
Specifics on proposed illumination (if any)
-
Specific materials to be used
Masonry
-
​Proposed brick pattern
-
Specific color and locations for mortar repairs
-
Specific cleaning methods proposed (including any chemicals to be used)
Siding
-
​Photographs and description of existing siding materials
-
Specific brand/type of siding proposed (cut sheets)
-
Specific color(s) proposed
Painting
-
​Specific color(s) to be used (chips, color numbers)
-
Locations of specific colors
Windows & Doors
-
​Specific windows/doors to be installed/replaced, their existing conditions
-
Manufacturer's cut sheets, with measurements
-
Information on pane/panel configuration
-
Specific materials of new windows/doors
-
Specific exterior hardware (if any)
-
Specific design, materials, colors of any trim
Roofing
-
Specific materials, colors of roofing to be replaced, its existing conditions
-
Specific materials, colors of proposed new roofing
-
Manufacturer's cut sheet(s)
-
Sample of material(s)
Ornamentation (porches, awnings, light fixtures, decorative trim, skirting etc.)
-
Location(s) of proposed work
-
Specific information on proposed modifications
-
Manufacturer's information/cut sheets for materials
-
Specific colors to be used (chips with brand name, color numbers)
Storefronts
-
To-scale drawings or proposed design, with measurements
-
Specific materials, colors to be used
-
Specifics on proposed windows/doors
Additions/New Construction
-
To-scale site plans, showing the existing structure, the proposed addition, the parcel lines, and the outline of any structure within 20 ft of the parcel lines
-
To-scale drawings showing proposed work in relation to existing conditions, with measurements
-
To-scale elevations showing proposed final design
-
Description of materials and colors to be used
Site Features
-
To-scale site plans, showing the existing structure, the proposed feature(s), the parcel lines, and the outline of any structure within 20 ft of the parcel lines
-
Manufacturer's information/cut sheets for materials
-
Specific design, materials, colors of proposed features
Demolition
-
Documentation of current condition of the structure (preferred report from a professional engineer or architect)
-
Specific plans for future/intended use of the site
Murals
-
To-scale color drawings/renderings of the proposed mural and proposed location of the mural on the structure
-
Specifics on any proposed illumination (if any).
-
Specific materials to be used.
-
Written approval from the property owner for the mural, provided the applicant is not the property owner.
-
An agreement between the artist and property owner identifying responsibilities.
-
A maintenance plan specifying care and the parties responsible for the maintenance of the mural. Maintenance includes, but is not limited to, graffiti removal, removal of surface dirt, reapplication of coatings, touching up damaged areas, and ensuring vegetation does not harm the mural or supporting building.
-
An agreement between the artist and the property owner identifying who is responsible for the removal of the mural.
-
Photo documentation of the completed mural shall be supplied to the HPC to provide a base line for future maintenance, conservation, and restoration.